# Step‑by‑Step Interior Execution Workflow (Client‑Shareable)

Most project chaos happens because clients and vendors don’t know what’s next. Share this workflow before execution begins to set expectations and avoid last‑minute surprises.

## How to Use
- Share the CSV checklist with clients and vendors
- Walk through each stage, confirm dependencies, agree on responsibilities
- Convert to your own Sheet and add dates/owners if needed

Open the checklist: [/resources/execution_workflow_list.csv](/resources/execution_workflow_list.csv)

---

## Stages Covered (Overview)
1. Site Cleaning & Preparation
2. Site Marking & Layout
3. Electrical Conduit Laying
4. Plumbing Line Laying
5. HVAC Line Laying
6. False Ceiling Framing
7. False Ceiling Board Installation & Finishing
8. Wall Surface Preparation
9. Primer & Base Coat Painting
10. Electrical Switch & Light Point Box Fixing
11. Tile / Stone Flooring Laying (if applicable)
12. Bathroom Fixtures Installation
13. Furniture Framework Marking & Measurement
14. Material Procurement for Carpentry
15. Plywood Structure Framing & Base Work
16. Laminate / Veneer Finishing
17. Shutter & Drawer Fixing
18. Hardware Installation
19. Soft Furnishings (Curtains, Upholstery)
20. Furniture Polishing (if applicable)
21. Final Cleaning & Inspection
22. Painting Final Coat
23. Light Fixture Installation
24. AC Installation (Testing where applicable)
25. Appliance Installation (Hob, chimney, geysers, fans)
26. Deep Cleaning
27. Client Walkthrough & Snag List
28. Snag Rectification
29. Final Handover (documents, warranties, manuals)

> Tip: Pair this with the Site Progress Tracker pack to add owners, dependencies, and approvals.